600kWh ESS Shenzhen EMF
Date: 2023
Project Type: Commercial & Industrial (C&I) Energy Storage System / Peak Shaving & Valley Filling
Location: Shenzhen, China (EMF)
Energy Storage: 600kWh Battery Energy Storage System (ESS)
Objective: Deploy a 600kWh energy storage system at the Shenzhen EMF facility to optimize electricity costs through peak-shaving and valley-filling, reduce demand charges, and enhance power reliability for critical operations.
