Shandong 500kW/2570kWh * 4 container Energy Storage
Date: 2021
Project Type: Large-Scale Commercial & Industrial (C&I) / Utility-Scale Energy Storage System (Peak Shaving & Grid Support)
Location: Shandong Province, China
Energy Storage: 500kW / 2570kWh × 4 Containerized Battery Energy Storage System (Total Capacity: 2MW / 10.28MWh)
Objective: Deploy a large-scale, multi-containerized energy storage system to perform peak shaving and valley filling, optimize electricity consumption costs for high-load operations, and support regional grid stability under Shandong's dynamic energy policies.
